GALANTE, Giacomo Maria
GALANTE, Giacomo Maria
Ingegneria
A Bayesian approach for predictive maintenance policy with imperfect monitoring
2009-01-01 Curcurù, G; Galante,GM
A bottom-up procedure to calculate the Top Event probability in presence of epistemic uncertainty
2012-01-01 Curcurù, G; Galante, GM; La Fata, CM
A cost model for the selection of a maintenance activity in a series system
2012-01-01 Curcurù, G; Galante, GM; Passannanti, G
A Dempster-Shafer Theory-Based Approach to Compute the Birnbaum Importance Measure under Epistemic Uncertainty
2016-01-01 Curcurù, G.; Galante, G.M.; La Fata, C.M.
A Fuzzy inference model for the layout design
2011-01-01 Certa, A; Enea, M; Galante, GM
A fuzzy parameter to characterize the uncertainty in the plant layout design
2015-01-01 Certa, A.; Enea, M.; Galante, G.
A hierarchical framework for the measurement of maintenance efficacy and efficiency using performance indicators
2014-01-01 Galante, GM; Inghilleri, R; La Fata, CM
A Model for Periodic Preventive Maintenance Policy for a Series Parallel System
2009-01-01 Certa, A; Galante, GM; Lupo, T; Passannanti, A; Passannanti, G
A Multi-Criteria Group Decision To Support The Maintenance Service: A Case Study
2015-01-01 Certa, A.; Enea, M.; Galante, G.; Lupo, T.
A multi-decision makers approach to select the maintenance plan for a multi-component system.
2013-01-01 Certa, A; Enea, M; Galante, G; Lupo, T
A multi-objective approach to facility layout problem by genetic search algorithm and Electre method
2006-01-01 AIELLO G; ENEA M; GALANTE G
A multi-objective approach to facility layout problem by genetic search and Electre method
2005-01-01 AIELLO; G; ENEA; M; GALANTE G
A Multi-Objective Approach to Optimize a Periodic Maintenance Policy
2012-01-01 Certa, A.; Enea, M.; Galante, G.; Lupo, T.
A Multi-Objective Approach to Optimize a Periodic Maintenance Policy
2012-01-01 Certa, A.; Enea, M.; Galante, G.; Lupo, T.
A multi-objective approach to solid waste management
2010-01-01 Galante,GM; Aiello, G; Enea, M;Panascia, E
A Multistep Methodology for the Evaluation of Human Resources Using the Evidence Theory
2013-01-01 Certa,A;Enea,M;Galante,GM;La Fata,CM
A predictive maintenance policy with imperfect monitoring
2010-01-01 Curcurù, G; Galante, GM; Lombardo, A
A Project Manager Suitability Parameter in Project Accomplishment
2010-01-01 Certa, A; Enea, M; Galante, GM; La Fata, CM
An Effective Approach For The Maintenance Scheduling In Large Systems With Required Reliability Level: A Case Study
2015-01-01 Certa, A.; Galante, G.; Lupo, T.; Passannanti, G.
An equation to calculate the availability for the k-out-of-n system
2016-01-01 Carpitella, S; Certa, A; Galante, G; Izquierdo, J; La Fata, CM