PASSANNANTI, Gianfranco
PASSANNANTI, Gianfranco
Ingegneria
A cost model for the selection of a maintenance activity in a series system
2012-01-01 Curcurù, G; Galante, GM; Passannanti, G
A Model for Periodic Preventive Maintenance Policy for a Series Parallel System
2009-01-01 Certa, A; Galante, GM; Lupo, T; Passannanti, A; Passannanti, G
A multi-objective fleet routing optimization for passenger shipping among islands
2009-01-01 Cannizzaro, L; Enea, M; La Fata, CM; Passannanti, G
A MULTI-OBJECTIVE GENETIC ALGORITHM FOR THE PASSENGER MARITIME TRANSPORTATION PROBLEM
2014-01-01 La Fata, CM; Passannanti, G
A new innovative cooling law for simulated annealing algorithms
2015-01-01 Certa, A.; Lupo, T.; Passannanti, G.
A simulated annealing-based approach for the joint optimization of production/inventory and preventive maintenance policies
2017-01-01 La Fata, C.M.; Passannanti, G.
An Effective Approach For The Maintenance Scheduling In Large Systems With Required Reliability Level: A Case Study
2015-01-01 Certa, A.; Galante, G.; Lupo, T.; Passannanti, G.
An Effective Double Sampling Scheme for the c Control Chart
2015-01-01 Inghilleri, R; Lupo, T; Passannanti, G
An efficient proposal for the application of simulated annealing algorithms
2014-01-01 Certa, A; Lupo, T; Passannanti, G
An exact algorithm for preventive maintenance planning of series-parallel systems
2009-01-01 GALANTE, GM; PASSANNANTI, G
Determination of Pareto frontier in multi-objective maintenance optimization
2011-01-01 Certa, A; Galante, GM; Lupo, T; Passannanti, G
Handling epistemic uncertainty in the Fault Tree Analysis using interval valued expert information
2014-01-01 Francese, M;Galante, GM; La Fata, CM; Passannanti G
Handling the epistemic uncertainty in the selective maintenance problem
2020-01-01 Galante G.M.; La Fata C.M.; Lupo T.; Passannanti G.
Integrated Approach to Part Scheduling and Inspection Policies for a Job Shop Manufacturing System
2007-01-01 GALANTE, G; PASSANNANTI, G
Maintenance Planning For The Reliability Maximization In A Large System With Vagueness In The Reliability Values Of Some Components
2015-01-01 Certa, A.; Galante, G.; Lupo, T.; Passannanti, G.
MInimizing earliness and tardiness costs by ant system approach
2005-01-01 GALANTE, G; PANASCIA, E; PASSANNANTI, G
Minimizing the cycle time in serial manufacturing systems with multiple dual-gripper robots
2006-01-01 GALANTE, G; PASSANNANTI, G
Optimal Maintenance For a System with Required Reliability
2008-01-01 CERTA, A; GALANTE, GM; LUPO, T; PASSANNANTI, G
Optimal Selection of Maintenance Actions on a Multi-Component System
2010-01-01 Certa, A; Galante, GM; La Fata, CM; Passannanti, G
Optimum scheduling of dual gripper robots
2005-01-01 AIELLO, G; GALANTE, G; PASSANNANTI, G