Robots are being used more and more extensively as material-handling systems for automated manufacturing systems. This is especially true for dual-gripper robots whose in-process buffer (the robot's second gripper) constitutes a further element of flexibility. When the number of stations to be served is high and the set of activities the robot must execute is great, the system throughput may depend on robot capability rather than on process times. In such conditions, the use of several robots leads to an increase in system productivity. Obviously, the design and the management of such a handling system becomes more complex: the minimum number of robots required, the work stations to be served by each of them and the robot move cycles must be all determined so as to minimize the cycle time of a multi-robot serial system. Since the aim of minimizing the cycle time could lead to a non-univocal configuration, a secondary objective may be pursued. To this aim, the classic case of a single dual-gripper robotic cell is preliminarily revisited, using a practical rather than a theoretical approach, to show that, under the conditions of minimum cycle time, it is possible to take into account both the reduction of the WIP and that of the length of the transitory periods.

GALANTE, G., PASSANNANTI, G. (2006). Minimizing the cycle time in serial manufacturing systems with multiple dual-gripper robots. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 44(4), 639-652 [10.1080/00207540500337544].

Minimizing the cycle time in serial manufacturing systems with multiple dual-gripper robots

GALANTE, Giacomo Maria;PASSANNANTI, Gianfranco
2006-01-01

Abstract

Robots are being used more and more extensively as material-handling systems for automated manufacturing systems. This is especially true for dual-gripper robots whose in-process buffer (the robot's second gripper) constitutes a further element of flexibility. When the number of stations to be served is high and the set of activities the robot must execute is great, the system throughput may depend on robot capability rather than on process times. In such conditions, the use of several robots leads to an increase in system productivity. Obviously, the design and the management of such a handling system becomes more complex: the minimum number of robots required, the work stations to be served by each of them and the robot move cycles must be all determined so as to minimize the cycle time of a multi-robot serial system. Since the aim of minimizing the cycle time could lead to a non-univocal configuration, a secondary objective may be pursued. To this aim, the classic case of a single dual-gripper robotic cell is preliminarily revisited, using a practical rather than a theoretical approach, to show that, under the conditions of minimum cycle time, it is possible to take into account both the reduction of the WIP and that of the length of the transitory periods.
2006
Settore ING-IND/17 - Impianti Industriali Meccanici
GALANTE, G., PASSANNANTI, G. (2006). Minimizing the cycle time in serial manufacturing systems with multiple dual-gripper robots. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 44(4), 639-652 [10.1080/00207540500337544].
File in questo prodotto:
File Dimensione Formato  
Lavoro PDF definitivo.pdf

Solo gestori archvio

Dimensione 157.31 kB
Formato Adobe PDF
157.31 kB Adobe PDF   Visualizza/Apri   Richiedi una copia

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10447/3904
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 16
  • ???jsp.display-item.citation.isi??? 13
social impact