The construction of prestressed concrete bridges often presents different construction stages in which the structural static scheme changes many times, together with the characteristics of the construction elements. In fact, prefabrication and in situ assembly involve a multiple variation of the scheme with the introduction and removal of restraints, especially when temporary sup-ports are used. These transitional phases can strongly modify the structural behavior, in relation also to the deformations due to shrinkage and creep. In this study an evaluation of the effects of time-dependent phenomena is presented, for the case of complex sequences in which delayed restraints and removal of provisional supports occur till the final configuration is achieved. The study is based on analytical methods and creep models available in the literature, discussing the implications on long-term behavior of bridges, both in terms of deformation and variation of the stress state. A practical application is also presented.

Arici M., G.M. (2018). La variazione di schema statico nei ponti in cemento armato precompresso durante le fasi costruttive e l’influenza dei fenomeni lenti. In Proceedings of Italian Concrete Days 2018.

La variazione di schema statico nei ponti in cemento armato precompresso durante le fasi costruttive e l’influenza dei fenomeni lenti

Arici M.;Granata M. F.
2018-01-01

Abstract

The construction of prestressed concrete bridges often presents different construction stages in which the structural static scheme changes many times, together with the characteristics of the construction elements. In fact, prefabrication and in situ assembly involve a multiple variation of the scheme with the introduction and removal of restraints, especially when temporary sup-ports are used. These transitional phases can strongly modify the structural behavior, in relation also to the deformations due to shrinkage and creep. In this study an evaluation of the effects of time-dependent phenomena is presented, for the case of complex sequences in which delayed restraints and removal of provisional supports occur till the final configuration is achieved. The study is based on analytical methods and creep models available in the literature, discussing the implications on long-term behavior of bridges, both in terms of deformation and variation of the stress state. A practical application is also presented.
2018
Arici M., G.M. (2018). La variazione di schema statico nei ponti in cemento armato precompresso durante le fasi costruttive e l’influenza dei fenomeni lenti. In Proceedings of Italian Concrete Days 2018.
File in questo prodotto:
File Dimensione Formato  
Revised Memoria 66 - ARICI_GRANATA_VARIAZ_.pdf

Solo gestori archvio

Tipologia: Versione Editoriale
Dimensione 285.77 kB
Formato Adobe PDF
285.77 kB Adobe PDF   Visualizza/Apri   Richiedi una copia

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10447/549682
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact