This paper reports the results of a simulation study with the aim of evaluating the capability of two portions of a hybrid AC/DC MV/LV network of maintaining their operation in off-grid mode during the loss of the main AC grid due to a failure. In particular, the study aims to verify, in the case of islanded operation of the two microgrids, the continuity of the electricity service by exploiting the local generation plants, Energy Storage Systems (ESSs), and other flexible resources managed by suitable algorithms in different energy scenarios. The analysis was carried out considering two microgrids: an underground station and a car parking with Electric Vehicles (EVs). For assessing the performance of the network, specific indicators have been defined and calculated.
Bonì A., Favuzza S., Ippolito M.G., Massaro F., Moradi S., Musca R., et al. (2021). A Simulation Analysis for Assessing the Reliability of AC/DC Hybrid Microgrids - Part I: Underground Station and Car Parking. In 21st IEEE International Conference on Environment and Electrical Engineering and 2021 5th IEEE Industrial and Commercial Power System Europe, EEEIC / I and CPS Europe 2021 - Proceedings (pp. 1-6). Institute of Electrical and Electronics Engineers Inc. [10.1109/EEEIC/ICPSEurope51590.2021.9584826].
A Simulation Analysis for Assessing the Reliability of AC/DC Hybrid Microgrids - Part I: Underground Station and Car Parking
Favuzza S.;Ippolito M. G.;Massaro F.;Moradi S.;Musca R.;Porgi V.;Zizzo G.
2021-11-01
Abstract
This paper reports the results of a simulation study with the aim of evaluating the capability of two portions of a hybrid AC/DC MV/LV network of maintaining their operation in off-grid mode during the loss of the main AC grid due to a failure. In particular, the study aims to verify, in the case of islanded operation of the two microgrids, the continuity of the electricity service by exploiting the local generation plants, Energy Storage Systems (ESSs), and other flexible resources managed by suitable algorithms in different energy scenarios. The analysis was carried out considering two microgrids: an underground station and a car parking with Electric Vehicles (EVs). For assessing the performance of the network, specific indicators have been defined and calculated.File | Dimensione | Formato | |
---|---|---|---|
A_Simulation_Analysis_Part_I_Underground_Station_and_Car_Parking.pdf
Solo gestori archvio
Descrizione: Articolo pubblicato
Tipologia:
Versione Editoriale
Dimensione
512.26 kB
Formato
Adobe PDF
|
512.26 kB | Adobe PDF | Visualizza/Apri Richiedi una copia |
postprint I.pdf
accesso aperto
Descrizione: Postprint
Tipologia:
Post-print
Dimensione
898.89 kB
Formato
Adobe PDF
|
898.89 kB | Adobe PDF | Visualizza/Apri |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.