The essay reframes the so-called “preliminary of a preliminary agreement” as a contract whose cause lies in the rational deferral of commitment: it stabilizes a narrow core of essential terms while scheduling a later, full consolidation of the bargain. The paper articulates a two-step test (first, whether the initial writing already qualifies as a full preliminary enforceable under art. 2932 c.c.; only failing that, the worthiness of a staged formation) and, focusing on real-estate practice, explains that the “second preliminary” typically serves merely formal or opposability purposes (e.g., art. 2645-bis c.c.), without duplicating the obligatory phase. A consistent remedial regime follows: no specific performance for the interlocutory stage, but endoprocedural contractual liability measured by the negative interest (with loss of chance subject to strict proof); the broker’s fee is generally excluded where only a pre-preliminary agreement exists. Ultimately, phased contracting attains practical normativity, and time becomes a structural component of contractual cause and remedial design.

Tardia, I. (2025). Il preliminare di preliminare tra causa concreta, meritevolezza e governo del tempo contrattuale. IURA AND LEGAL SYSTEMS, XII(4), 19-37.

Il preliminare di preliminare tra causa concreta, meritevolezza e governo del tempo contrattuale

Tardia, Ignazio
2025-01-01

Abstract

The essay reframes the so-called “preliminary of a preliminary agreement” as a contract whose cause lies in the rational deferral of commitment: it stabilizes a narrow core of essential terms while scheduling a later, full consolidation of the bargain. The paper articulates a two-step test (first, whether the initial writing already qualifies as a full preliminary enforceable under art. 2932 c.c.; only failing that, the worthiness of a staged formation) and, focusing on real-estate practice, explains that the “second preliminary” typically serves merely formal or opposability purposes (e.g., art. 2645-bis c.c.), without duplicating the obligatory phase. A consistent remedial regime follows: no specific performance for the interlocutory stage, but endoprocedural contractual liability measured by the negative interest (with loss of chance subject to strict proof); the broker’s fee is generally excluded where only a pre-preliminary agreement exists. Ultimately, phased contracting attains practical normativity, and time becomes a structural component of contractual cause and remedial design.
2025
Settore GIUR-01/A - Diritto privato
Tardia, I. (2025). Il preliminare di preliminare tra causa concreta, meritevolezza e governo del tempo contrattuale. IURA AND LEGAL SYSTEMS, XII(4), 19-37.
File in questo prodotto:
File Dimensione Formato  
Il preliminare di preliminare tra causa concreta, meritevolezza e governo del tempo contrattuale - IGNAZIO TARDIA.pdf

accesso aperto

Tipologia: Versione Editoriale
Dimensione 381.15 kB
Formato Adobe PDF
381.15 kB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10447/690643
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus ND
  • ???jsp.display-item.citation.isi??? ND
social impact