The paper presents a deterministic technique for assessing and preventing project risks, by determining the risk of the Work Progress Status. Firstly, the performance of the input factors, namely the costs, quality, and time, are detected, that reflect the Iron Triangle of the Project Management. As each phase ends, the actual values of the input factors are detected and compared with that planned, and corrective actions are taken for considering the impact of the actual performances on the overall project. Thus, the current risk degree of the project is determined through the Weighted Sum Method. If it is higher than planned, preventive actions are taken, in order to mitigate the risk of the entire project. Practical applications of the technique relate to routine projects and those cases in which the schedule/costs/requirements are to be defined in the planning phase, and deviations are detected in the progress phase.

Muriana C., Vizzini G. (2017). Project risk management: A deterministic quantitative technique for assessment and mitigation. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 35(3), 320-340 [10.1016/j.ijproman.2017.01.010].

Project risk management: A deterministic quantitative technique for assessment and mitigation

Muriana C.
Primo
;
2017-01-01

Abstract

The paper presents a deterministic technique for assessing and preventing project risks, by determining the risk of the Work Progress Status. Firstly, the performance of the input factors, namely the costs, quality, and time, are detected, that reflect the Iron Triangle of the Project Management. As each phase ends, the actual values of the input factors are detected and compared with that planned, and corrective actions are taken for considering the impact of the actual performances on the overall project. Thus, the current risk degree of the project is determined through the Weighted Sum Method. If it is higher than planned, preventive actions are taken, in order to mitigate the risk of the entire project. Practical applications of the technique relate to routine projects and those cases in which the schedule/costs/requirements are to be defined in the planning phase, and deviations are detected in the progress phase.
2017
Muriana C., Vizzini G. (2017). Project risk management: A deterministic quantitative technique for assessment and mitigation. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 35(3), 320-340 [10.1016/j.ijproman.2017.01.010].
File in questo prodotto:
File Dimensione Formato  
1-s2.0-S0263786317300613-main.pdf

Solo gestori archvio

Tipologia: Versione Editoriale
Dimensione 808.84 kB
Formato Adobe PDF
808.84 kB Adobe PDF   Visualizza/Apri   Richiedi una copia

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10447/644923
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 95
  • ???jsp.display-item.citation.isi??? 68
social impact