This study analysed a submerged membrane bioreactor (SMBR) start-up with the purpose of determining the best conditions to carry it out. In order to do this, a hollow fibre membrane module was installed in a submerged configuration in a pilot aerobic reactor. The experiment was then divided in two phases, lasting 65 days each. During phase 1, the pilot plant was started-up without inoculum of activated sludge and no sludge, withdrawal was performed. Conversely, in phase 2, the MBR pilot plant was started-up with sludge inoculum and the sludge concentration was kept constant. In both phases, the volumetric loading rate applied to the pilot plant was kept constant. The authors analysed the difference in carbon removal performances, the evolution of floc sizes and the fouling rate in both phases. The results confirmed that MBRs can be quickly and easily started-up, but the initial start-up strategy can influence membrane fouling. More specifically, the carbon removal performances were similar in both phases, while the fouling rate increased faster during the start-up without inoculum, especially in terms of irreversible deposition of soluble compost on the membrane surface and into membrane pores.

This study analysed a submerged membrane bioreactor (SMBR) start-up with the purpose of determining the best conditions to carry it out. In order to do this, a hollow fibre membrane module was installed in a submerged configuration in a pilot aerobic reactor. The experiment was then divided in two phases, lasting 65 days each. During phase 1, the pilot plant was started-up without inoculum of activated sludge and no sludge, withdrawal was performed. Conversely, in phase 2, the MBR pilot plant was started-up with sludge inoculum and the sludge concentration was kept constant. In both phases, the volumetric loading rate applied to the pilot plant was kept constant. The authors analysed the difference in carbon removal performances, the evolution of floc sizes and the fouling rate in both phases. The results confirmed that MBRs can be quickly and easily started-up, but the initial start-up strategy can influence membrane fouling. More specifically, the carbon removal performances were similar in both phases, while the fouling rate increased faster during the start-up without inoculum, especially in terms of irreversible deposition of soluble compost on the membrane surface and into membrane pores.

Di Bella, G., Durante, F., Torregrossa, M., Viviani, G. (2010). Start-up with or without inoculum? Analysis of an SMBR pilot plant. DESALINATION, 260 (2010)(260 (2010)), 79-90 [10.1016/j.desal.2010.04.063].

Start-up with or without inoculum? Analysis of an SMBR pilot plant.

DI BELLA, Gaetano;TORREGROSSA, Michele;VIVIANI, Gaspare
2010-01-01

Abstract

This study analysed a submerged membrane bioreactor (SMBR) start-up with the purpose of determining the best conditions to carry it out. In order to do this, a hollow fibre membrane module was installed in a submerged configuration in a pilot aerobic reactor. The experiment was then divided in two phases, lasting 65 days each. During phase 1, the pilot plant was started-up without inoculum of activated sludge and no sludge, withdrawal was performed. Conversely, in phase 2, the MBR pilot plant was started-up with sludge inoculum and the sludge concentration was kept constant. In both phases, the volumetric loading rate applied to the pilot plant was kept constant. The authors analysed the difference in carbon removal performances, the evolution of floc sizes and the fouling rate in both phases. The results confirmed that MBRs can be quickly and easily started-up, but the initial start-up strategy can influence membrane fouling. More specifically, the carbon removal performances were similar in both phases, while the fouling rate increased faster during the start-up without inoculum, especially in terms of irreversible deposition of soluble compost on the membrane surface and into membrane pores.
2010
Settore ICAR/03 - Ingegneria Sanitaria-Ambientale
Di Bella, G., Durante, F., Torregrossa, M., Viviani, G. (2010). Start-up with or without inoculum? Analysis of an SMBR pilot plant. DESALINATION, 260 (2010)(260 (2010)), 79-90 [10.1016/j.desal.2010.04.063].
File in questo prodotto:
File Dimensione Formato  
Start-up with or without inoculum DI Bella et al 2010.pdf

accesso aperto

Dimensione 1.03 MB
Formato Adobe PDF
1.03 MB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10447/64458
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 36
  • ???jsp.display-item.citation.isi??? 32
social impact