The operation and test of mock-ups of tritium breeding blankets relevant for a future commercial reactor is one of the goals of the ITER machine. To accomplish this goal, mock-ups of breeding blankets, called Test Blanket Modules (TBMs), are installed in three ITER equatorial ports. Each TBM and the associated shield form a TBM-set that is mechanically attached to a steel frame called TBM Frame. A Frame and two TBM-Sets form a TBM Port Plug (TBM PP). The ITER Organization is responsible for the design and manufacture of the TBM Frames and of the Dummy TBMs that could replace the TBM-sets in case they were not available. This paper describes the recent results of the design supporting analyses for the TBM Frames and Dummy TBMs that is presently in the preliminary design stage and their impact on the design.

Kim, B., Marconi, M., Di Maio, P., Torres, L., Lucca, F., Gicquel, S., et al. (2016). Design and manufacturing feasibility of ITER TBM Frame and Dummy TBMs. FUSION ENGINEERING AND DESIGN, 109-111(A), 996-1000 [10.1016/j.fusengdes.2016.01.036].

Design and manufacturing feasibility of ITER TBM Frame and Dummy TBMs

Di Maio, P.;
2016-01-01

Abstract

The operation and test of mock-ups of tritium breeding blankets relevant for a future commercial reactor is one of the goals of the ITER machine. To accomplish this goal, mock-ups of breeding blankets, called Test Blanket Modules (TBMs), are installed in three ITER equatorial ports. Each TBM and the associated shield form a TBM-set that is mechanically attached to a steel frame called TBM Frame. A Frame and two TBM-Sets form a TBM Port Plug (TBM PP). The ITER Organization is responsible for the design and manufacture of the TBM Frames and of the Dummy TBMs that could replace the TBM-sets in case they were not available. This paper describes the recent results of the design supporting analyses for the TBM Frames and Dummy TBMs that is presently in the preliminary design stage and their impact on the design.
2016
Settore ING-IND/19 - Impianti Nucleari
Kim, B., Marconi, M., Di Maio, P., Torres, L., Lucca, F., Gicquel, S., et al. (2016). Design and manufacturing feasibility of ITER TBM Frame and Dummy TBMs. FUSION ENGINEERING AND DESIGN, 109-111(A), 996-1000 [10.1016/j.fusengdes.2016.01.036].
File in questo prodotto:
File Dimensione Formato  
Fusion Engineering and Design 109-111 (2016) 996-1000.pdf

Solo gestori archvio

Descrizione: Articolo
Dimensione 2.48 MB
Formato Adobe PDF
2.48 MB Adobe PDF   Visualizza/Apri   Richiedi una copia
Handle - 10447-222159 - Fusion Engineering and Design, 109-111, (A), pp. 996-1000, 2016.pdf

accesso aperto

Dimensione 1.1 MB
Formato Adobe PDF
1.1 MB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10447/222159
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 6
  • ???jsp.display-item.citation.isi??? 6
social impact