ALONGE F, DIPPOLITO F, RAIMONDI F M, AIELLO V (2006). Task scheduling control of BGA solder joint process in flexible manufacturing system. In Proceedings of 10th IEEE International Conference on Emerging Technologies and Factory Automation (pp.171-178). Institute of Electrical and Electronics Engineers Inc. [10.1109/ETFA.2005.1612677].
Task scheduling control of BGA solder joint process in flexible manufacturing system
ALONGE, Francesco;D'IPPOLITO, Filippo;RAIMONDI, Francesco Maria;AIELLO, Vincenzo
2006-01-01
File in questo prodotto:
File | Dimensione | Formato | |
---|---|---|---|
01612677.pdf
Solo gestori archvio
Descrizione: Articolo principale
Dimensione
7.42 MB
Formato
Adobe PDF
|
7.42 MB | Adobe PDF | Visualizza/Apri Richiedi una copia |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.