ALONGE F, DIPPOLITO F, RAIMONDI F M, AIELLO V (2006). Task scheduling control of BGA solder joint process in flexible manufacturing system. In Proceedings of 10th IEEE International Conference on Emerging Technologies and Factory Automation (pp.171-178). Institute of Electrical and Electronics Engineers Inc. [10.1109/ETFA.2005.1612677].

Task scheduling control of BGA solder joint process in flexible manufacturing system

ALONGE, Francesco;D'IPPOLITO, Filippo;RAIMONDI, Francesco Maria;AIELLO, Vincenzo
2006-01-01

Settore ING-INF/04 - Automatica
set-2005
10TH IEEE INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, ETFA ’05
Catania, Italy.
September 19-22, 2005
2006
8
A stampa
ALONGE F, DIPPOLITO F, RAIMONDI F M, AIELLO V (2006). Task scheduling control of BGA solder joint process in flexible manufacturing system. In Proceedings of 10th IEEE International Conference on Emerging Technologies and Factory Automation (pp.171-178). Institute of Electrical and Electronics Engineers Inc. [10.1109/ETFA.2005.1612677].
Proceedings (atti dei congressi)
ALONGE F; DIPPOLITO F; RAIMONDI F M; AIELLO V
File in questo prodotto:
File Dimensione Formato  
01612677.pdf

Solo gestori archvio

Descrizione: Articolo principale
Dimensione 7.42 MB
Formato Adobe PDF
7.42 MB Adobe PDF   Visualizza/Apri   Richiedi una copia

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/10447/27942
Citazioni
  • ???jsp.display-item.citation.pmc??? ND
  • Scopus 0
  • ???jsp.display-item.citation.isi??? 0
social impact