Sfoglia per Autore
Approccio multicriterio al problema del layout con ELECTRE
2004-01-01 AIELLO G; ENEA M; GALANTE G; Enea, M.
Le tecniche di ragionamento approssimato nella gestione dei container terminal
2004-01-01 Enea, M; Galante, G; Panascia, E
Logistica delle merci La rivoluzione del container
2005-01-01 ENEA, M; GALANTE, GM; PANASCIA, E
MInimizing earliness and tardiness costs by ant system approach
2005-01-01 GALANTE, G; PANASCIA, E; PASSANNANTI, G
Optimum scheduling of dual gripper robots
2005-01-01 AIELLO, G; GALANTE, G; PASSANNANTI, G
A multi-objective approach to facility layout problem by genetic search and Electre method
2005-01-01 AIELLO; G; ENEA; M; GALANTE G
The facility layout problem approached using a fuzzy model and a genetic search
2005-01-01 ENEA M; GALANTE G; PANASCIA E
Multi-skilled human resources allocation in R&D projects
2006-01-01 CERTA A; ENEA M; GALANTE G; LA FATA CM
A multi-objective approach to facility layout problem by genetic search algorithm and Electre method
2006-01-01 AIELLO G; ENEA M; GALANTE G
Minimizing the cycle time in serial manufacturing systems with multiple dual-gripper robots
2006-01-01 GALANTE, G; PASSANNANTI, G
Integrated Approach to Part Scheduling and Inspection Policies for a Job Shop Manufacturing System
2007-01-01 GALANTE, G; PASSANNANTI, G
Criteri di valutazione nelle attività decisionali di una azienda di trasporto tranviario
2008-01-01 LO PRESTI, M; CAMINITI, D; CERTA, A; GALANTE, GM; SALOMONE, M
Optimal Maintenance For a System with Required Reliability
2008-01-01 CERTA, A; GALANTE, GM; LUPO, T; PASSANNANTI, G
Project manager assignment by fuzzy inference and mathematical programming
2008-01-01 CERTA, A; ENEA, M; GALANTE, GM; LA FATA, CM
A Bayesian approach for predictive maintenance policy with imperfect monitoring
2009-01-01 Curcurù, G; Galante,GM
Robust Maintenance Scheduling for Reliability Maximization
2009-01-01 Certa, A; Galante, GM; Lupo, T; Passannanti, G
A Model for Periodic Preventive Maintenance Policy for a Series Parallel System
2009-01-01 Certa, A; Galante, GM; Lupo, T; Passannanti, A; Passannanti, G
Clean Agent Selection Approached by Fuzzy TOPSIS Decision-Making Method
2009-01-01 AIELLO G; ENEA, M; GALANTE, GM; LA SCALIA, GM
An exact algorithm for preventive maintenance planning of series-parallel systems
2009-01-01 GALANTE, GM; PASSANNANTI, G
Multi-objective human resources allocation in R&D projects planning
2009-01-01 CERTA, A; ENEA, M; GALANTE, GM; LA FATA, CM
Legenda icone
- file ad accesso aperto
- file disponibili sulla rete interna
- file disponibili agli utenti autorizzati
- file disponibili solo agli amministratori
- file sotto embargo
- nessun file disponibile